Generator Test – BOL1
Yesterday’s routine generator test passed as expected. The generator was started manually, then run off-load 10:23 – 10:44 All measured values were within their normal ranges.
Yesterday’s routine generator test passed as expected. The generator was started manually, then run off-load 10:23 – 10:44 All measured values were within their normal ranges.
Further to our recent ticket, our IP Transit connection to Level3 Communications is offline again. At 1:05am this morning, our physical link to Level3 Communications is reported as down. As this is the second event recently, we have escalated this with the provider. Due to the unclean shutdown, a… Continue reading
Today’s monthly on-load generator test passed as expected. The generator was started automatically after detecting the mains isolation, then ran on-load 11:05 – 11:25 The generator detected recovery of mains and shut down automatically in the expected timeframe All measured values were within their normal ranges.
Today’s monthly on-load generator test passed as expected. The generator was started automatically after detecting the mains isolation, then ran on-load 10:28 – 10:51 The generator detected recovery of mains and shut down automatically in the expected timeframe All measured values were within their normal ranges.
We experienced an outage of one of our interlinks between Bolton and Manchester provided by Virgin Media overnight. This fibre-optic link failed to pass traffic between 12:04am and 2:36am. Due to our resilient ring network topology, no outage occurred to customers in Bolton as traffic diverted via an alternate fibre… Continue reading
At 10:53am UK local time, we saw our physical link to Level3 (AS3356) drop for 5 minutes. This caused our routers to immediately terminate the BGP routing session with Level3 and start to reconverge via our alternative paths leading to 2-3 minutes of instability whilst routes updated. The link to… Continue reading
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 10:27 – 10:43 All measured values were within their normal ranges.
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 10:09 – 10:22 All measured values were within their normal ranges.
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 11:38 – 11:55 All measured values were within their normal ranges.
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 10:35 – 10:52 All measured values were within their normal ranges.