Commercial Power Failure – Bolton
At approximately 7:10am this morning, we experience a commerical power failure of the L2 phase of power entering out Bolton 1 facility. This caused our Generator to take over the entire load of the building. Cooling was maintained via ‘free cooling’ (external filtered air travelling through the building via powerful… Continue reading