We will be performing network upgrades across our entire network (Manchester, Bolton, and London) shortly.
We will begin with the Bolton and Manchester networks during March 2018.
This work will involve replacing our entire switching network with new Cisco switches operating at both Layer 2 and Layer 3 modes.
This work should be mainly non service affecting, with only a few seconds of outage per port maximum.