Generator Test – BOL2
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 10:58 – 11:18 All measured values were within their normal ranges.
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 10:58 – 11:18 All measured values were within their normal ranges.
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 10:27 – 10:48 All measured values were within their normal ranges.
Today’s monthly on-load generator test passed as expected. The generator was started automatically after detecting the mains isolation, then ran on-load 10:33 – 10:56 The generator detected recovery of mains and shut down automatically in the expected timeframe All measured values were within their normal ranges.
Today’s monthly on-load generator test has been deferred to avoid posssible complications with unidentified 3rd party utility works in the locale. A routine off-load generator test passed as expected. The generator was started manually, then run off-load 10:00 – 10:26 All measured values were within their normal ranges.
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 11:31 – 11:51 All measured values were within their normal ranges.
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 11:00 – 11:19 All measured values were within their normal ranges.
We have received notification from BT that one of our metro interlink circuits needs an outage on 8th February 2016 starting at 11pm until 6am UK local time as the fibre optic cabling needs to be re-routed for National Rail engineering works. This circuit forms part of our dual metro… Continue reading
This morning we experienced an increase latency and packet loss event at our bolton and manchester locations due to external factors beyond our control. This occured between 03:02am and 03:06am, and again between 03:09am and 03:13am UK local time. During the above windows, latency was increased above normal levels, and… Continue reading
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 10:49 – 11:10 All measured values were within their normal ranges.
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 10:15 – 10:34 All measured values were within their normal ranges.