Generator Test
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 12:13 – 12:30 All measured values were within their normal ranges.
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 12:13 – 12:30 All measured values were within their normal ranges.
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 11:40 – 11:55 All measured values were within their normal ranges.
Our monthly on-load generator test passed successfully today. It was triggered using the mains fail simulation switch, the generator auto-started and took over the load within the expected timeframe. We ran the full load on the generator for 20 minutes between 12:15 and 12:35pm before failing back over to commercial… Continue reading
Today’s routine generator test passed without issue. This was an off-load generator test from 10:05am to 10:35am – all output values were normal. Next Monday will be our monthly on-load generator test.
Our regular scheduled generator maintenance passed this morning. We ran on full load between 10:15am and 10:50am without issues. All voltage and current tests passed. We will continue with off-load generator tests starting next Monday morning.
Our supplier appears to have completed their maintenance early. The circuit has been back in operation since approx. 10pm without any issues. All traffic restored to its relative preferred path automatically. We will continue to monitor the circuit until the end of the supplier maintenance window (midnight UK local time)… Continue reading
One of our core network partners, Cable&Wireless, are currently performing routine maintenance on one of the segments of our core inter-building networks. All traffic has been automatically diverted via its failover path. During this maintenance window, our resilience is reduced. There is also the possibility of a brief disturbance to… Continue reading
We were notified of an outage on one of our backup servers (DT-310) this morning at approximately 9:00am UK local time. The server sufferred a hardware RAID controller failure with its HP SmartArray controller. For the sake of data integrity, the filesystem is performing a full FSCK (filesystem check) and… Continue reading
Today’s full on-load generator test completed successfully. The generator handled the full datacentre load from 10:30am until 11:00am without any issues reported. The next on-load test will be Wednesday 2nd January 2013
Today’s generator test passed without any issues. Approx runtime was 20 minutes off-load.