Routine Generator Test
Today’s 30 minute off-load routine generator test passed with no issues. The generator was started manually and ran for 30 minutes with no load connected. The next scheduled on-load generator test is Monday 5th November 2012.
Today’s 30 minute off-load routine generator test passed with no issues. The generator was started manually and ran for 30 minutes with no load connected. The next scheduled on-load generator test is Monday 5th November 2012.
This morning at 8:10am, we started seeing increased latency and packet loss between our network and BT internet. This settled down at 10:34am. Some diagnostics showed the problem to be around the London area, possibly at the interconnect of Global Crossing and BT. BT have raised this as a fault… Continue reading
Yesterday’s routine generator maintenance went fine, followed by a brief on-load generator test.