Generator Test – BOL2 By Gavin Jackson | April 27, 2015 - 12:23 pm |April 27, 2015 Maintenance Today’s routine generator test passed as expected. The generator was started manually, then run off-load 10:50 – 11:12 All measured values were within their normal ranges. Bookmark the permalink.