Generator Tests – BOL

After a minor change in operating procedure, we briefly neglected to post the results of our weekly generator tests. For completeness, here’s a list of the intervening tests…

28-08-2016
BOL1  10:12 - 10:38  Off load  Passed
BOL2  10:56 - 11:13  Off load  Passed

05-07-2016
BOL1  10:24 - 10:42  On load   Passed
BOL2  10:53 - 11:16  On load   Passed

12-07-2016
BOL1  10:20 - 10:49  Off load  Passed
BOL2  11:02 - 11:22  Off load  Passed

19-07-2016
BOL1  10:15 - 10:25  Off load  Passed
BOL2  10:55 - 11:14  Off load  Passed

28-07-2016
BOL1  10:08 - 10:32  Off load  Passed
BOL2  10:41 - 11:03  Off load  Passed

The generator was started, then ran off-load / on-load for the durations given above, before detecting mains and shutting down in the expected timeframe.
All measured values were within their normal ranges.