Generator Test – BOL2
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 10:40 – 11:01 All measured values were within their normal ranges.
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 10:40 – 11:01 All measured values were within their normal ranges.
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 10:07 – 10:27 All measured values were within their normal ranges.
Various security vulnerabilities in various MS Windows OS’s (Client and Server) Various remote code execution vulnerability have been identified, and given the common vulnerability and exposures designation of CVE-2015-1719 to CVE-2015-1727. We have seen recent activity on customers’ Windows servers, relating to new exploits that are currently active. The exploits… Continue reading
Netnorth have recently established additional DNS fabric in Hemel Hempstead, providing further resilience to our hosted services. We now operate various networked DNS servers deployed across 5 distinct geo-locations: LON1 – London MAN1 – Manchester BOL1 – Bolton BOL2 – Bolton HEM1 – Hemel Hempstead All of Netnorth’s DNS servers… Continue reading
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 09:58 – 10:18 All measured values were within their normal ranges.
Today’s routine generator test passed as expected. The generator was started manually, then run off-load 09:25 – 09:44 All measured values were within their normal ranges.
Further to yesterday’s outage, we were alerted to another identical outage this evening at 11:26pm. Once again, our automated failover systems migrated the site to locally generated power. We are awaiting an update from ENWL, our regional energy supplier, with regards to a time to repair.
We experienced a power outage of phase L3 on the commercial mains input at our BOL2 site at approx. 5:45pm this afternoon. The automated failover procedure occurred as expected and the site transferred over to locally generated power. The entire site became powered by generator for the duration of the… Continue reading
Today’s monthly on-load generator test passed as expected. The generator was started automatically after detecting the mains isolation, then ran on-load 11:32 – 11:54 The generator detected recovery of mains and shut down automatically in the expected timeframe All measured values were within their normal ranges.
Today’s monthly on-load generator test passed as expected. The generator was started automatically after detecting the mains isolation, then ran on-load 10:55 – 11:18 The generator detected recovery of mains and shut down automatically in the expected timeframe All measured values were within their normal ranges.