Our monthly on-load generator test passed successfully today.
It was triggered using the mains fail simulation switch, the generator auto-started and took over the load within the expected timeframe.
We ran the full load on the generator for 20 minutes between 12:15 and 12:35pm before failing back over to commercial mains.
All test values were within their normal ranges (voltage, frequency etc.)