On-load Generator Test
Our monthly on-load generator test passed successfully today. It was triggered using the mains fail simulation switch, the generator auto-started and took over the load within the expected timeframe. We ran the full load on the generator for 20 minutes between 12:15 and 12:35pm before failing back over to commercial… Continue reading