Routine Generator Test

Today’s 30 minute off-load routine generator test passed with no issues.

The generator was started manually and ran for 30 minutes with no load connected.

The next scheduled on-load generator test is Monday 5th November 2012.

Bookmark the permalink.

Leave a Reply