Generator Test

Our weekly off-load generator test completed successfully this morning.  It ran (without load) from approx. 10:20am until 10:40am, with its output voltages and frequency monitored.

The next scheduled off-load test is Monday 29th October 2012.

The next scheduled full on-load test is Monday 5th November 2012.

BT Internet Connectivity Issue

This morning at 8:10am, we started seeing increased latency and packet loss between our network and BT internet.  This settled down at 10:34am.

Some diagnostics showed the problem to be around the London area, possibly at the interconnect of Global Crossing and BT.

BT have raised this as a fault as seen at the following link:

http://btbusiness.custhelp.com/app/service_status#issue21737

You can also see the graph for the latency and packet loss below.

Latency and Packet loss