We are currently upgrading the capacity on our secondary IP transit connection from Cogent Communications. This circuit is being increased to 1000mbps.
The new fibre optic interlink has been installed, the configuration will be complete by the end of September 2012.
This link provides both IPv4 and IPv6 connectivity to our network.