On-Load Generator Test – BOL2

Today’s monthly on-load generator test passed as expected.

The generator was started automatically after detecting the mains isolation, then ran on-load 10:20 – 10:42
The generator detected recovery of mains and shut down automatically in the expected timeframe
All measured values were within their normal ranges.

Bookmark the permalink.

Leave a Reply